CONSTRUCTION OF INDUSTRIAL FACILITIES
Other countries
Formwork STAYMAX UKRAINE
Construction of massive walls at an industrial facility using ROBUD STAYMAX heavy series formwork.
To fix and align the formwork vertically, ROBUD - P1300 struts are used. The strut length is 13 meters, the adjustment range is 1.0 meter.
The height of the monolithic walls is 12 meters, the thickness is 1.0 meter.
